Precise Building Consent & Fast Turnaround
In need of a quick move-in time, our client wanted a reliable and timely solution in getting their plans approved.
With the need for a quick move-in time, and therefore construction process, this client’s vibrant Manurewa project called upon VIKON for a swift and accurate building consent application. Key to the project’s priorities, this residential build called for meticulous drawings that could get approval without any snags.
In order to make the consent process as smooth as possible, VIKON conducted close and proactive communication with our client. This included clarification for any missing details, ambiguous notes, or further compliance evidence.
We made sure that everything to do with architectural, structural, fire, HVAC, and services was thoroughly assessed and ready to pass. With the entire construction timeline depending on our consent’s approval, VIKON’s thorough consistency across strategy, drawings, and reports minimised the risk of council questions – addressing any and every concern in advance.
Thanks to our planning, research, and expert team, our submitted building consent was approved without a hitch. A testament to our policy of meeting deadlines, our work helped the project’s turnaround while also ensuring both safety and quality.
VIKON are pleased to have helped realise this playful and lively home. The design itself was a quad-bedroom, single-storey build with a traditional floor plan. Featuring an outdoor deck, this home had plenty of breathability and easy backyard access.